About Us
Projects
Design
Innovation
Careers
News
Contact
Site Map



Home    

Education K-12

Fremont Primary Center #2
Los Angeles Unified School District
Los Angeles, California

45,500 SF
2-story classroom with
  1-story subterranean parking
1-story multipurpose
1-story library
dining

Fremont Primary Center #2 is the first Type V, 1-hour school over subterranean parking to be permitted through DSA and constructed for LAUSD. Our negotiations with DSA over the design criteria for the discontinuous wood shear walls at the concrete podium has set the standard for all similar projects to follow. The school is a two-story wood building supported partially on grade and partially by a flat plate reinforced concrete slab above the basement parking. Other challenges in the project included discontinuous wood shear walls at the second floor above the Kindergarten Classroom and stepped roof diaphragms at the Multipurpose Building and at the Library.

 

 


PROJECTS

Hotels/Residential

Mixed-Use

Office Buildings

Parking Structures

Retail

Special Projects/ Entertainment 

Education - K thru 12

Education – University

Healthcare/Research

Institutional

Seismic/Historical 

Wind Studies