About Us
Projects
Design
Innovation
Careers
News
Contact
Site Map



Home    

Office Buildings

Central Park at Toluca Lake
Toluca Lake, California

500,000 sf development
14 story, 260,000 sf office tower
4 level, 240,000 sf subterranean parking

Two tones of banded brick surround a highly atriculated facade for Central Park at Toluca Lake. The office tower is supported with an efficient and economical on metal stud connection to the concrete on metal deck composite floor system. The office portion makes up only 2% of the Plaza Level with 72% serving as a Park which is supported by a structural steel framing system. Despite two v-shaped reveals per building face, 4 cantilever corners at each floor, brick facade, extensively landscaped park at the Plaza Level, the resulting design of the structural system was an economical 13 pounds per square foot.

 


PROJECTS

Hotels/Residential

Mixed-Use

Office Buildings

Parking Structures

Retail

Special Projects/ Entertainment 

Education - K thru 12

Education – University

Healthcare/Research

Institutional

Seismic/Historical 

Wind Studies