The Cedars-Sinai Medical Center South Parking Structure consists of 5-inch thick concrete post-tensioned slab with 36-inch deep post-tensioned beams and girders. Concrete ductile frames in both directions resist seismic forces. The basement of the structure is approximately 35 feet below the water table and the foundation is a combination of 5 foot thick concrete mat with tension auger piles to resist the hydrostatic upward pressure. Precast panels in the lower levels and metal panels and planters in the upper levels cover the exterior of the structure.