“The elevator to success is out of order. You’ll have to use the stairs, one step at a time.” – Joe Girard
The pedestrian bridge at Rio Hondo College spans 140 feet long and 10 feet wide and is supported by structural steel beams with a central steel tower that supporting two suspended steel cables on either side. These cables provide additional intermediate support to the steel girders. Project completed in 2008.
Architect: Steven Ehrlich Architects
Photographer: Manuel V. Jaramillo