Oceanwide Plaza
The glazing is complete on the 40-story residential towers and work on the interiors is bustling to realize our structural design of the 2,408,372- square-foot Oceanwide Plaza!
From Project Engineer to Associate, congratulations Omid Esmaili, PhD, PE!
The glazing is complete on the 40-story residential towers and work on the interiors is bustling to realize our structural design of the 2,408,372- square-foot Oceanwide Plaza!
“World’s Largest Outdoor Shake Table Receives $16.3M from NSF for Upgrades “In the past 14 years, research at UC San Diego’s shake table, which is housed at the university’s Englekirk Structural Engineering Center, has led to important changes in design codes for commercial and residential structures and new insights into the seismic performance of geotechnical…
Throwback Thursday to the Topping Out of the SDSU New Student Residence Hall. Englekirk accomplished another design build collaboration with the ACMP/Clark team!
From Project Engineer to Associate, congratulations Regan Kobayashi, PE, SE!
From Project Engineer to Associate, congratulations Brian Wada, PE, SE!
Englekirk’s Senior Designer, BIM Modeler Carlos Gonzalez lets loose on Saturday at the NLCS Game 2 Watch Party to benefit the Justin Turner Foundation! IMG_1786
Shoreline Gateway broke ground last week! Once complete, the Performance Based Design (PBD) tower will rise 35 floors and be the tallest structure in Long Beach. To read more follow this link- https://www.bisnow.com/los-angeles/news/multifamily/tallest-residential-building-to-rise-in-long-beach-93736?be=kimberly.tanouye%40englekirk.com&utm_source=Newsletter&utm_medium=email&utm_campaign=tue-09-oct-2018-000000-0400_los-angeles-re Owner: AndersonPacific, LLC and Ledcor Properties, Inc.
From Project Engineer to Associate, congratulations Claudio Coletta, PE!
From Project Engineer to Associate, congratulations Ricardo Roldan PhD, PE!